Dense towers, many now fifteen to twenty years old, where the services behind the walls matter more than the finishes in front of them.

The Community

Renovating in Dubai Silicon Oasis

Dubai Silicon Oasis is a free zone with its own authority, and that is the first thing to establish about renovating here. Building modifications and fit-out approvals go to the Dubai Silicon Oasis Authority rather than to Dubai Municipality. It is a well-run process, but it is its own process, and a contractor who assumes a Dubai Municipality route will lose time.

The apartment stock spans roughly 2008 to 2018, which is a wide enough range that the right brief differs sharply across it. The earlier buildings are at the point where services replacement is the project. The later ones are closer to a finishes and layout exercise, with the services largely still serviceable.

The community is predominantly owner-occupier and family oriented, and the briefs reflect that: more kitchen and storage reconfiguration, more work to make a third bedroom function properly, and less of the investor-refresh work that dominates some other districts.

On Survey

What We Typically Find in Dubai Silicon Oasis

The things worth knowing before you set a budget.

DSOA, not Dubai Municipality

Dubai Silicon Oasis Authority issues building modification and fit-out approvals for the free zone. Its own portal, its own requirements. Submitting to Dubai Municipality is the common and costly mistake here.

A decade of different stock

Buildings span roughly 2008 to 2018. A 2009 apartment is a services project, a 2017 one usually is not, and pricing them the same way is how a budget goes wrong.

Storage that was never enough

Family-occupied units in layouts that were drawn for investors. Joinery and reconfiguration to create usable storage is the most common brief we price here.

Services in the earlier stock

Pipework, boards and AC from 2008 to 2012 handovers are now at the age where they need attention rather than inspection.

District cooling

Chilled water across most of the community. Fan coils and valves are yours and are the usual source of a comfort problem; the plant is not.

Family layouts and acoustics

Converting a study to a bedroom or opening a kitchen raises acoustic questions that matter more in a family home than in a let unit. Worth designing for rather than discovering.

Budgeting

Renovation Costs in Dubai Silicon Oasis

Indicative ranges for the property types found here.

Indicative ranges for Dubai Silicon Oasis. Stock spans a decade, so the survey matters more than usual. Excludes VAT, professional fees and contingency.
ScopeWhat it coversRange
Full apartment refurbishmentStrip-out to handover including services replacementAED 180k – 650k
Kitchen and bathrooms onlySingle-area refits, services locally reworkedAED 70k – 260k
Cosmetic refreshFlooring, decoration and joinery, services untouchedAED 45k – 140k

These are starting points based on the apartment types in Dubai Silicon Oasis. The number that matters is the measured one — we survey the apartment, produce a bill of quantities, and give you a fixed price against it.

Request a Free Site Visit
Approvals & Programme

Approvals and Programme in Dubai Silicon Oasis

What has to be in place before work starts, and how long it realistically takes.

The DSOA approval

Dubai Silicon Oasis is a free zone with its own authority, so building modification and fit-out approvals are issued by the Dubai Silicon Oasis Authority rather than by Dubai Municipality. The submission needs drawings, a registered contractor and current insurance. Allow two to four weeks from a complete submission, and expect the inspection regime to be its own as well.

Building management consent

Your building's management separately controls service lift booking, working hours and protection of common areas. These are two distinct permissions and both have to be in place before work starts.

Both sit with us. You are not the one chasing an approvals desk — we prepare the drawings, make the submissions and carry the correspondence. If you want the detail, we have written up community NOCs, the Dubai Municipality modification permit and a plain explanation of when a permit is actually needed.

Indicative programme for a full apartment renovation in Dubai Silicon Oasis. Confirmed against your apartment at survey.
StageDuration
Survey, drawings and measured bill of quantities2 – 3 weeks
DSOA approval and building management consent2 – 5 weeks
Strip-out, services and first fix3 – 6 weeks
Second fix, joinery and finishes4 – 7 weeks
Testing, snagging and handover1 – 2 weeks
How We Price

How We Price a Dubai Silicon Oasis Renovation

Benstead is run by a quantity surveyor, and it shows in the quotation more than anywhere else. We do not price an apartment by walking through it and naming a figure. We measure it.

After the survey you receive a bill of quantities — every element of the work listed, quantified and rated, so you can see what each part costs and what it is you are agreeing to. That document is what the fixed price is built on, and it is what we get measured against later.

It matters for two practical reasons. You can compare our price against another contractor’s line by line instead of guessing why one number is bigger. And when something changes mid-project — and in a 2008 to 2018 building something usually does — there is an agreed rate for it already, rather than a negotiation while your apartment is in pieces.

If you are collecting quotations at the moment, our guides on why renovation quotes vary so much and the red flags in a renovation quote are worth ten minutes before you sign anything. You can also get an indicative range in about a minute from the Dubai renovation cost calculator.

Cost Guides

Real figures, before you commit

Questions

Dubai Silicon Oasis Apartment FAQs

Does Dubai Municipality approve renovations in Silicon Oasis?

No. Dubai Silicon Oasis is a free zone with its own authority, and building modification and fit-out approvals are issued by the Dubai Silicon Oasis Authority through its own process. A contractor who submits to Dubai Municipality has gone to the wrong body. Your building's management separately controls access, lift booking and working hours.

Does the age of my building matter here?

A great deal. Silicon Oasis apartment stock spans roughly 2008 to 2018, and that range covers two quite different projects. An apartment from 2009 or 2010 is primarily a services replacement job. One from 2016 onward is usually a finishes and layout exercise with the services still serviceable. Pricing them the same way is how budgets go wrong.

What do most people here ask for?

Storage and layout. Silicon Oasis is predominantly owner-occupied and family oriented, but a lot of the stock was laid out for investors, so the most common brief is reconfiguring to create usable storage, making a third bedroom work properly, or opening up a kitchen that was drawn too small for a family.

Is the cooling a district system?

Across most of the community, yes. That means the chillers belong to the building and what you own is the fan coil units, valves and condensate drainage. Comfort problems almost always sit in those rather than in the plant, which is why replacing a thermostat rarely changes anything.

Can I convert the study into a bedroom?

Usually, subject to DSOA approval if it touches structure or the approved layout, and subject to the room meeting ventilation and egress requirements. The part people underestimate is acoustics: a partition that satisfies the drawing can still transmit enough sound to make the room unusable as a bedroom, so it is worth designing properly.

How long does a Silicon Oasis apartment renovation take?

For a full renovation, around twelve to sixteen weeks on site, plus two to five weeks beforehand for DSOA approval and building consent.

Dubai Silicon Oasis

Get a Measured Price
for Your Dubai Silicon Oasis Apartment

We know the approval route and the property types here. Site visit and quotation are both free.