One system that controls lighting, climate, blinds, audio and security — and still works in five years when you have forgotten how it was set up.

What We Do

Infrastructure First, Gadgets Second

Almost every smart home that disappoints does so for the same reason: it was bought as products rather than designed as infrastructure.

The parts that matter are invisible and have to be installed before the walls close. Structured cabling to every likely device position. A properly ventilated rack location. Neutral wires at switch positions, which older Dubai villas frequently lack. Adequate wireless access point coverage, which a single router will never provide in a villa with block walls.

Get that right and you can change, extend or replace the visible technology for the next fifteen years. Get it wrong and every future addition means chasing walls again.

We install Crestron, Control4 and Lutron alongside more modest systems where those are the sensible answer. Not every house needs a fully integrated platform — but every house being renovated should have the cabling put in while the walls are open, because that costs very little now and a great deal later.

Request a Fixed-Price Quotation
Scope of Works

What a Smart Home Installation Covers

The cabling and the rack are the project. The apps are the easy part.

Structured Cabling

Cat6 or Cat6a to every device position — access points, control panels, televisions, cameras, door stations — terminated to a central rack. Done during first fix, at a fraction of retro-fit cost.

Lighting Control

Dimming and scene control with neutral wires provided at every switch position, keypads set out with the electrical layout, and circuits designed around scenes rather than rooms.

Climate Integration

AC zoning and thermostats brought onto the same system as lighting, so schedules and occupancy control actually reduce running costs. See AC replacement.

Audio & Video

Multi-room audio with ceiling or in-wall speakers, television and projector provision, and cabling routed so no visible trunking is ever needed.

Blinds & Shading

Motorised blinds and curtains with power and control cabling provided at every window during first fix — the single most commonly forgotten item.

Security & Access

Cameras, video door stations, intercom, alarm and access control integrated into the same platform rather than run as separate apps.

Budgeting

Smart Home Costs in Dubai

Priced by how much infrastructure goes in and how integrated the system is.

Indicative Dubai smart home costs, August 2026. Excludes VAT. Assumes installation during a renovation with walls open.
LevelWhat it includesIndicative range
Infrastructure onlyStructured cabling, rack, access points, neutral wires and conduit provision.AED 25k – 70k
Lighting & blinds controlDimming, keypads, scenes, motorised blind control.AED 60k – 180k
Integrated systemLighting, climate, audio, blinds and security on one platform.AED 180k – 450k
Full high-specificationCrestron or equivalent with full AV, cinema and multi-zone audio.AED 450k – 1.2m+

Even if you are not installing a smart system now, install the cabling. Structured cabling and conduit during a renovation costs a small fraction of what retro-fitting the same routes costs once the house is finished and decorated.

The other decision worth making early is where the rack lives. It needs ventilation, power and access for servicing. A cupboard under the stairs with no airflow will cook the equipment, and that is where it usually ends up when nobody planned for it.

On Survey

What We Typically Find

The things worth knowing before you set a budget.

Containment at first fix

The single decision that matters. Cable routes, back boxes and a location for the rack have to go in before walls are closed. Retrofitting any of it means surface trunking or lifting finishes.

Wired against wireless

Wireless is flexible and fails intermittently through blockwork. Wired is reliable and has to be planned. Most good installations are a mix, decided at design stage rather than after the plasterer has gone.

Where the rack lives

Equipment generates heat and noise and needs ventilation and access. A cupboard under the stairs with no airflow is where a lot of systems quietly cook themselves.

Lighting circuits, not light fittings

Smart lighting is a circuit and control decision made at first fix. Choosing fittings at the end and hoping to make them smart afterwards is the common and expensive mistake.

Systems that have to talk

AC, lighting, blinds, audio, security and access each come from different suppliers. Whether they integrate is decided by the choices made at the start, not by the app you install later.

Someone has to maintain it

A system nobody can support is a liability. Specifying hardware with local support and documenting what was installed matters more in year three than the feature list did in year one.

Approvals & Programme

Approvals and Programme

What has to be in place before work starts, and how long it realistically takes.

What approvals a system actually needs

A smart home installation on its own rarely needs an authority permit, since running containment and cabling within existing walls changes neither structure, drainage nor the approved layout. The community NOC is still required for access, contractor registration and working hours. Where it does become a permit matter is where the work forms part of a wider renovation that is altering the layout, or where external equipment — cameras, gate hardware, antennas — changes the appearance of the property.

The authority permit, where it applies

Where the works touch structure, drainage or the approved layout, a Dubai Municipality modification permit is required as well — or the equivalent from your district's authority, since Palm Jumeirah goes to Trakhees and the Barsha Heights districts to DDA. Work staying within the existing layout frequently needs no permit at all.

These sit with us. We prepare the drawings, make the submissions and carry the correspondence. There is a plain explanation of when a permit is actually needed and of what happens if work goes ahead without one.

Indicative programme. Confirmed against your property at survey.
StageDuration
Survey, drawings and measured bill of quantities1 – 3 weeks
Community NOC and any authority permit2 – 5 weeks
Strip-out and first fix1 – 3 weeks
Second fix, finishes and joinery2 – 5 weeks
Testing, snagging and handover1 week
How We Price

How We Price Smart Home Installation

Benstead is run by a quantity surveyor. We do not price work by looking at it and naming a figure — we measure it, and you receive a bill of quantities with every element listed, quantified and rated. That is what makes two quotations comparable, and what gives an agreed rate for anything that changes mid-project.

Worth ten minutes before you sign anything: why renovation quotes vary, red flags in a renovation quote and what a bill of quantities actually is. For an indicative range in about a minute, use the Dubai renovation cost calculator.

Questions

Smart Home FAQs

Do I have to commit to a full system now?

No, and often you should not. The sensible approach during a renovation is to install the infrastructure — cabling, conduit, neutral wires and rack provision — and add visible technology in stages.

Cabling is the expensive thing to add later. Panels and devices are comparatively easy to retro-fit.

Will it still work in ten years?

That depends on the cabling far more than the brand. Structured cabling to every device position, adequate conduit and a ventilated rack mean the technology can be replaced repeatedly without touching the house.

Systems that become obsolete quickly are almost always wireless-dependent installations with no physical infrastructure behind them.

When do I need to decide on smart home systems?

At first fix, before walls and ceilings close. Containment, cable routes, back boxes and the rack location all have to be in place then. Deciding afterwards means either wireless everywhere, with the reliability problems that brings in blockwork construction, or lifting finishes.

Is wired or wireless better?

Wired for anything that must work reliably — lighting control, AC, security. Wireless for things where an occasional dropout is tolerable. Most good installations combine them, and the decision belongs at design stage because the wired half cannot be added later without disruption.

Where should the equipment rack go?

Somewhere ventilated, accessible and not adjacent to a bedroom. Equipment generates heat and fan noise, and an unventilated cupboard shortens its life considerably. It also needs to be reachable, because something will eventually need attention.

Can I make my existing lighting smart?

Partly, through smart bulbs or switch modules, but it is a workaround rather than a system. Proper smart lighting is a circuit and control decision made at first fix. Retrofitting gives you an app and not much of the benefit.

Who supports it afterwards?

That is worth asking before you buy. Systems installed by someone who then disappears, using hardware with no local support, become unusable the first time something fails. Documentation of what was installed and where matters more in year three than any feature.

Get Started

Put the Cabling In
While the Walls Are Open

Even if the system comes later. Tell us what you are planning and we will specify the infrastructure.